Structural design coordinator, managing
all administrative aspects of the project
directly relevant to the design and construction
of a grade separation and miscellaneous
structures.
We provided detailed structural design
and drafting for two significant transportation
structures, including a precast, post-tensioned
'tub girder' bridge and a highly skewed,
precast box stringer structure. Additional
services included the preparation of cost
estimates, bills of material, and technical
specifications for all structural components
of the project.
This project was a unique Public / Private
partnership with funding provided by a
private developer, the local municipality
and the BC Ministry of Transportation.
The schedule was extremely aggressive,
and saw the facility fully open to traffic
less than three months after the start
of construction.
|